    CSSP-2000 simulation training system for power generation, as a system integrated control, information and simulation, takes responsibility to manage power plant, train and examine technical staffs, review and preview post disturbance, optimize and research control strategy of machine sets as well as test hardware of control system.
    The whole system is dependent on Local Area Network (LAN) to function. Engineer station solves configuration and calculation of simulating statistics in one machine of multi-mode. Coach station mainly manages rooms of simulating system. Operator station is freely divided into groups according to requirements. Panels and other connectors are linked with LAN as required.



     